Energy Storage
11507 E Adobe Rd, Mesa, AZ
- Contractor
- Not in source
- Applicant
- Hannah Raymundo
- Owner
- Not in source
- Architect
- Not in source
- Engineer
- Not in source
- Contractor license
- Not in source
- Building class
- Not in source
- Zoning district
- Not in source
- Lot area
- Not in source
- Year built
- Not in source
- Units (total)
- Not in source
- Units (residential)
- Not in source
- Units (commercial)
- Not in source
- Floor area
- Not in source
- Parcel APN
- 22011307
- Climate zone (IECC)
- 2B
- Roof area (est.)
- Not derivable — no building-size signal for this permit
- HVAC tonnage (est.)
- Not derivable — no building-size signal for this permit
- Building type
- Not in source
- Building subtype
- Electrical
- Coordinates
- 33.4294, -111.5827
- Geocode confidence
- 100%
- Geocode source
- Not in source
- Issued
- Mar 5, 2026
- Applied
- Feb 18, 2026
- Work class
- Residential
Source description
PERMIT IS ONLY FOR INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES AND MPU 225AMPS. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES FOR ANY DAMAGE TO DISTRIBUTION EQUIPMENT. EFFECTIVE JANUARY 8, 2026, THE CITY OF MESA ADOPTED 2024 ICC AND 2023 NEC. AN APPROVED CODE MODIFICATION WAS ADDED TO THIS PERMIT ALLOWING CONTINUED COMPLIANCE WITH 2018 ICC AND 2017 NEC. STARTING APRIL 8, 2026, ALL NEW PERMITTED PROJECTS NOT SPECIFICALLY CONNECTED TO THIS PERMIT SHALL COMPLY WITH ADOPTED 2024 ICC AND 2023 NEC CODES. PLEASE VISIT MESA DEVELOPMENT SERVICES WEBSITE FOR INFORMATION ON THE ADOPTION PROCESS.
- Current status
- issued
- Source status
- C of C Issued
- Finaled
- Mar 31, 2026
- First seen by PermitCore
- May 5, 2026 · 09:26 UTC
- Last seen
- May 15, 2026 · 09:04 UTC
- Last changed
- May 15, 2026 · 09:04 UTC
0 of 12 data-quality rules flagged anything on this permit.
Checks not flagged
- Geocode out of bounds
- Geocode is sentinel
- Issued date in the future
- Issued date parse bug
- Issued date is placeholder
- Commercial units is placeholder
- Residential units out of bounds
- Residential units is placeholder
- Total units out of bounds
- Total units is placeholder
- Valuation out of bounds
- Valuation is placeholder
- Mar 5, 2026This permitEnergy Storage · Issued$22,500
- May 6, 2005BLD2005-04779Pool Spa · Finaled$26,000
Full permit history at this parcel · as of Jul 9, 2026.
Developer details
- Permit #
- PMT26-03116
- Canonical ID
- 143:PMT26-03116
- Source permit ID
- PMT26-03116