Home·Segments·Temporary Construction Support

Temporary Construction Support

Temporary structures supporting active construction projects.

750K permits classified across 2 metros

Browse temporary construction support permits in New York City
Definition

What it covers

Temporary construction support permits cover scaffolding, hoists, sidewalk sheds, temporary fencing, construction trailers, and other interim structures filed to support an active construction project. In dense urban environments (NYC especially) this segment can be the second-largest by volume because every major project files multiple temp-support permits as the work progresses.

Methodology

How a permit lands in Temporary Construction Support.

Every silver permit flows through a two-stage classifier. The deterministic stage maps the structured signals — work_class, the normalized permit type, and the building sub-type — into the segment vocabulary where the mapping is unambiguous. The machine-learning stage handles the cases that aren't direct lookups: multi-vocab permit-type strings, ambiguous occupancy spans, and jurisdictions that bundle categories. The segment is the classifier's output, the same axis across every metro — so temporary_construction_support means the same thing in NYC as in LA even though the upstream jurisdictions emit completely different raw permit-type strings.

When the signal genuinely isn't there, we say so. A row with no assignable segment degrades honestly — to its work-nature, then to its raw source type, and only to “Unclassified” when truly nothing is known. We never guess a segment to fill a gap; an honest Unclassified is the floor, and field-level data-quality flags surface when the classifier had low confidence. That restraint is the point — the classification is only worth selling on if the “don't know” is honest.

Coverage

Temporary Construction Support by metro — where it’s moving

Where temporary construction support permits are classified today, ranked by volume — with each metro’s momentum (the last 90 days vs the prior 90) so you can see where the segment is heating up in your territory. Momentum shows only where we have enough filings to stand behind it. Metros with recent activity link straight into the live browse.

Busiest metro right now: New York City — last 90 days vs the prior 90
Prior 90d7,891
Last 90d9,957

+26% vs prior 90d

Alert me when Temporary Construction Support momentum crosses a threshold.Single-window signal (last 90 days vs the prior 90) — at most once a week, no account.
+%

Email when Temporary Construction Support momentum in New York City crosses +25%.

Find Temporary Construction Support contractors near your branchEnter your address — see who’s pulling these permits in your radius.
Recent

Recent temporary construction support permits

Real permits classified into Temporary Construction Support in the last 30 days.

  • 95 Horatio StreetSidewalk / Shed$1K2026-08-26New York City
  • 275 Chestnut StreetConstruction / Fence2026-08-26New York City
  • 251 West 34 StreetConstruction / Support / Other$1K2026-08-26New York City
  • 2894 Grand ConcourseSidewalk / Shed$9K2026-08-26New York City
  • 59-40 Queens BoulevardSidewalk / Shed$5K2026-08-26New York City
  • 31 Bartlett StreetConstruction / Fence$1K2026-08-26New York City
Who sells into this

Who tracks Temporary Construction Support.

Temporary Construction Support is a sales-intelligence segment for scaffold, shoring, and site-services providers tracking active construction sites. Filter it by metro, rank the contractors pulling these permits, and see the projects worth selling into — the same way across every covered market.

← All segments