Energy Storage
259 S Wayfarer, Mesa, AZ
- Contractor
- Not in source
- Applicant
- On Point Solar Power
- Owner
- Not in source
- Architect
- Not in source
- Engineer
- Not in source
- Contractor license
- Not in source
- Building class
- Not in source
- Zoning district
- Not in source
- Lot area
- Not in source
- Year built
- Not in source
- Units (total)
- Not in source
- Units (residential)
- Not in source
- Units (commercial)
- Not in source
- Floor area
- Not in source
- Parcel APN
- 14026300
- Climate zone (IECC)
- 2B
- Roof area (est.)
- Not derivable — no building-size signal for this permit
- HVAC tonnage (est.)
- Not derivable — no building-size signal for this permit
- Building type
- Not in source
- Building subtype
- Electrical
- Coordinates
- 33.4102, -111.7765
- Geocode confidence
- 100%
- Geocode source
- Not in source
- Issued
- Feb 4, 2025
- Applied
- Oct 30, 2024
- Work class
- Residential
Source description
THIS PERMIT IS ONLY FOR THE INSTALLATION OF ONE (1) TESLA POWER WALL3 BATTERY. ALL WORK TO BE PERFORMED PER IRC 2018 AND SRP SPECIFICATIONS. ENERGY BACK UP SYSTEM TO BE INSTALLED PER MANUFACTURE INSTALLATION SPECIFICATIONS AND PER IRC 2018 SECTION R327. PERMIT DOES NOT INCLUDE PV SOLAR SYSTEM INSTALLATION. ADDENDA TO UPGRADE TO A 200A SOLAR READY PANEL WITH 200A BREAKER AND MODIFY ONE LINE DIAGRAM. INSTALLATION SHALL COMPLY WITH CITY OF MESA CODES AND SERVICING ELECTRIC UTILITY REQUIREMENTS. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR PERMIT. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES FOR ANY DAMAGE TO DISTRIBUTION EQUIPMENT. ADDENDA PMT24-19024B - MOVING FORWARD WITH A NEW MPU 200A RATED, 240V, INSTALLING A NEW BI-DIRECTIONAL TESLA BACKUP SWITCH AND RELOCATING SOME EQUIPMENT, SUCH AS MOVING THE FUSED DISCONNECT NEXT TO THE PW3 AND INSTALLING A NEW DER METER
- Current status
- issued
- Source status
- C of C Issued
- Finaled
- Apr 28, 2025
- First seen by PermitCore
- May 5, 2026 · 09:27 UTC
- Last seen
- May 15, 2026 · 09:04 UTC
- Last changed
- May 15, 2026 · 09:04 UTC
0 of 12 data-quality rules flagged anything on this permit.
Checks not flagged
- Geocode out of bounds
- Geocode is sentinel
- Issued date in the future
- Issued date parse bug
- Issued date is placeholder
- Commercial units is placeholder
- Residential units out of bounds
- Residential units is placeholder
- Total units out of bounds
- Total units is placeholder
- Valuation out of bounds
- Valuation is placeholder
- Feb 4, 2025This permitEnergy Storage · Issued$17,000
- Jul 8, 2021PMT21-10334MEP Electrical · Issued$2,000On Point Solar Power
Full permit history at this parcel · as of Aug 11, 2026.
Developer details
- Permit #
- PMT24-19024
- Canonical ID
- 143:PMT24-19024
- Source permit ID
- PMT24-19024