Demolition
1050 N Horne, Mesa, AZ
- Contractor
- Kleven Construction
- Applicant
- Not in source
- Owner
- Not in source
- Architect
- Not in source
- Engineer
- Not in source
- Contractor license
- Not in source
- Building class
- Not in source
- Zoning district
- Not in source
- Lot area
- Not in source
- Year built
- Not in source
- Units (total)
- Not in source
- Units (residential)
- Not in source
- Units (commercial)
- Not in source
- Floor area
- Not in source
- Parcel APN
- 13710002Q
- Climate zone (IECC)
- 2B
- Roof area (est.)
- Not derivable — no building-size signal for this permit
- HVAC tonnage (est.)
- Not derivable — no building-size signal for this permit
- Building type
- Not in source
- Building subtype
- Svc (PSF) -- Miscellaneous Permits/Fees
- Coordinates
- 33.4348, -111.8153
- Geocode confidence
- 100%
- Geocode source
- Not in source
- Issued
- Apr 24, 2012
- Applied
- Apr 24, 2012
- Work class
- Not in source
Source description
REF NCU2012-00212 PERMIT TO WORK ON THE FOLLOWING WEEKENDS: 4/28/12, 4/29/12, 5/5/12, 5/6/12, 5/12/12, 5/13/12 FROM 7:00 AM - 7:00 PM CONTACT: LUCILLIO PRECIDIO 602-714-0510 OR JIMMY OATIS 602-370-2996 If the Building Safety Director should determine that the public health and safety will not be impaired by the erection, demolition, alteration, or repair (including excavation) of any building or the excavation of streets and highways within the hours of six (6:00) P.M. and five (5:00) A.M. during the months of May, June, July, August, and September and within the hours of six (6:00) P.M. and six (6:00) A.M. during the rest of the months of the year, and if the Building Safety Director shall further determine that loss or inconvenience would result to any party in interest, the Building Safety Director may grant permission for such work to be done within the above hours upon application being made at the time the permit for the work is awarded or during the progress of the work. (2034,4028,4253) This permit is issued with the following conditions: 1. All residence within 500 feet of the project property line shall be notified in writing. The notice shall explain the purpose of the after hours work and the times and days the work will be performed. 2. The notice shall provide the name and phone number of the after-hours work supervisor. 3. All reasonable efforts will be taken to mitigate noise. 4. All reasonable efforts will be taken to mitigate fugitive light. 5. The applicant will respond positively to neighbor complaints. 6.BSD can cancel this permit if legitimate complaints are not resolved.
- Current status
- issued
- Source status
- Issued
- Finaled
- Apr 24, 2012
- First seen by PermitCore
- May 5, 2026 · 09:26 UTC
- Last seen
- May 15, 2026 · 09:02 UTC
- Last changed
- May 15, 2026 · 09:02 UTC
1 of 12 data-quality checks flagged on this permit. Detail below.
- Valuation is placeholder
valuation_usd_is_placeholdervaluation_usd matched a known placeholder (often 0 or 1) used by the source when the real valuation wasn't reported.
Checks not flagged
- Geocode out of bounds
- Geocode is sentinel
- Issued date in the future
- Issued date parse bug
- Issued date is placeholder
- Commercial units is placeholder
- Residential units out of bounds
- Residential units is placeholder
- Total units out of bounds
- Total units is placeholder
- Valuation out of bounds
- Apr 24, 2012This permitDemolition · IssuedKleven Construction
- Mar 6, 2006BLD2006-02296MEP Plumbing · FinaledKendall Plumbing & Rooter
- Sep 11, 2003BLD2003-02091Other · Finaled$250Kendall Plumbing & Rooter
- Sep 11, 2003BLD2003-02095Other · Finaled$250Kendall Plumbing & Rooter
- Aug 26, 2003BLD2003-01734Other · FinaledKendall Plumbing & Rooter
Full permit history at this parcel · as of Aug 11, 2026.
Developer details
- Permit #
- BLD2012-02032
- Canonical ID
- 143:BLD2012-02032
- Source permit ID
- BLD2012-02032