Permit history at parcel 85-94.

3 building permits recorded at this Boston parcel across 2020–2023 — the permit history detected in the public permit record.

Parcel record
Metro
Boston
Parcel key
85-94
Permits on record
3
Active
2020–2023

This is the permit history detected at this parcel in the public permit record — not a property-ownership or valuation record. Fields a permit didn’t carry show , never a fabricated value.

Permit timeline
IssuedPermitTypeWork classStatusContractorValue
Apr 10, 2023cambridge_aa_215368Alteration ResidentialResidentialIssuedCleanTech Construction$7K
Dec 29, 2020cambridge_aa_103291Alteration ResidentialResidentialIssuedRomain Strecker$3K
Dec 29, 2020cambridge_aa_103294Alteration ResidentialResidentialIssuedRomain Strecker$3K

Permit history as of Jul 8, 2026.