Permit history at parcel 24-78.

8 building permits recorded at this Boston parcel across 2022–2024 — the permit history detected in the public permit record.

Parcel record
Metro
Boston
Parcel key
24-78
Permits on record
8
Active
2022–2024

This is the permit history detected at this parcel in the public permit record — not a property-ownership or valuation record. Fields a permit didn’t carry show , never a fabricated value.

Permit timeline
IssuedPermitTypeWork classStatusContractorValue
Aug 27, 2024cambridge_aa_286634Alteration ResidentialResidentialIssuedna$22K
Jun 3, 2024cambridge_aa_274149Alteration ResidentialResidentialIssuedWollaston Construction$6K
Nov 30, 2023cambridge_aa_250140Alteration ResidentialResidentialIssued$5K
Mar 23, 2023cambridge_aa_215420Alteration ResidentialResidentialIssued$3K
Oct 21, 2022cambridge_aa_199163Alteration ResidentialResidentialIssued
Jul 26, 2022cambridge_aa_180005Alteration ResidentialResidentialIssued
Jun 28, 2022cambridge_aa_182101Alteration ResidentialResidentialIssued
Feb 8, 2022cambridge_aa_156457Alteration ResidentialResidentialIssuedWalter Tauro$5K

Permit history as of Jul 8, 2026.