Permit history at parcel 149-73.
3 building permits recorded at this Boston parcel across 2021–2022 — the permit history detected in the public permit record.
Parcel record
- Metro
- Boston
- Parcel key
- 149-73
- Permits on record
- 3
- Active
- 2021–2022
This is the permit history detected at this parcel in the public permit record — not a property-ownership or valuation record. Fields a permit didn’t carry show —, never a fabricated value.
Permit timeline
| Issued | Permit | Type | Work class | Status | Contractor | Value |
|---|---|---|---|---|---|---|
| May 10, 2022 | cambridge_aa_169183 | Alteration Residential | Residential | Finaled | Tucci Design Build | $97K |
| Aug 17, 2021 | cambridge_aa_138633 | Alteration Residential | Residential | Finaled | Neeeco | $6K |
| Aug 16, 2021 | cambridge_aa_138299 | Alteration Residential | Residential | Finaled | RB Farina Roofing | $10K |
Permit history as of Jul 8, 2026.