Bond Building Construction
Bond Building Construction concentrates in commercial alteration in Boston (91% of its 11 segment-eligible permits), with secondary activity across 1 other segment. Its permit record in Boston spans 2021–2026. Reliable permit valuations total ≈$38.0M (across the 100% of filings with a valuation we can stand behind).
- Market
- Boston
- Active
- 2021–2026 · 5 yrs
- Licence IDs on their permits
- —
- Reliable value
- $38.0M
- Coverage
- 100%
- Reliable filings
- 11
- Rank in Boston
- #601
- Permits (all-time, all segments)
- 11
- Filings 90d
- 0
- Filings 30d
- 0
- Latest permit
- Apr 29, 2026
Primarily Commercial Alteration — 91% of 11 segment-classified permits
Typical service area ~2 mi around Cambridge
The p90 footprint of where Bond Building Construction has pulled permits in Boston — drawn from all 11 of their indexed permits. It reflects detected permit activity, not a guaranteed service-area claim.
- Cambridge11
Showing 11 of 11 permits by Bond Building Construction in the indexed window · most recent first
- Apr 29, 2026Commercial Alteration1515 Massachusetts Ave, Cambridge, MA 02138Alteration$6.0Mapplied Apr 2, 2026
- May 27, 2025Commercial Alteration362 Memorial Dr, Cambridge, MA 02139Alteration$467Kapplied May 7, 2025
- May 5, 2025Commercial Alteration58 Oxford St, Cambridge, MA 02138Alteration$2.6Mapplied Apr 10, 2025
- Dec 27, 2024Commercial Alteration138 Albany St, Cambridge, MA 02139Alteration$1.5Mapplied Dec 13, 2024
- Aug 19, 2024Commercial Alteration100 Massachusetts Ave, Cambridge, MA 02139Alteration$244Kapplied Aug 12, 2024
- Oct 30, 2023Commercial Demolition60 Albany St, Cambridge, MA 02142Demolition · Commercial$721Kapplied Oct 5, 2023
- May 31, 2023Commercial Alteration46 Blackstone St, Cambridge, MA 02139Alteration$198Kapplied Apr 11, 2023
- Jun 16, 2022Commercial Alteration6 Appian Way, Cambridge, MA 02138Alteration$9.2Mapplied May 11, 2022
- May 26, 2022Commercial Alteration6 Appian Way, Cambridge, MA 02138Alteration$116Kapplied May 25, 2022
- Jun 3, 2021Commercial Alteration59 Vassar St, Cambridge, MA 02142Alteration$14.4Mapplied Feb 17, 2021
- Mar 31, 2021Commercial Alteration59 Vassar St, Cambridge, MA 02142Alteration$2.5Mapplied Mar 15, 2021
Apr 29, 2026 applied Apr 2, 2026 | 1515 Massachusetts Ave, Cambridge, MA 02138 | Commercial Alteration | $6.0M |
May 27, 2025 applied May 7, 2025 | 362 Memorial Dr, Cambridge, MA 02139 | Commercial Alteration | $467K |
May 5, 2025 applied Apr 10, 2025 | 58 Oxford St, Cambridge, MA 02138 | Commercial Alteration | $2.6M |
Dec 27, 2024 applied Dec 13, 2024 | 138 Albany St, Cambridge, MA 02139 | Commercial Alteration | $1.5M |
Aug 19, 2024 applied Aug 12, 2024 | 100 Massachusetts Ave, Cambridge, MA 02139 | Commercial Alteration | $244K |
Oct 30, 2023 applied Oct 5, 2023 | 60 Albany St, Cambridge, MA 02142 | Commercial Demolition Commercial | $721K |
May 31, 2023 applied Apr 11, 2023 | 46 Blackstone St, Cambridge, MA 02139 | Commercial Alteration | $198K |
Jun 16, 2022 applied May 11, 2022 | 6 Appian Way, Cambridge, MA 02138 | Commercial Alteration | $9.2M |
May 26, 2022 applied May 25, 2022 | 6 Appian Way, Cambridge, MA 02138 | Commercial Alteration | $116K |
Jun 3, 2021 applied Feb 17, 2021 | 59 Vassar St, Cambridge, MA 02142 | Commercial Alteration | $14.4M |
Mar 31, 2021 applied Mar 15, 2021 | 59 Vassar St, Cambridge, MA 02142 | Commercial Alteration | $2.5M |
Addresses where Bond Building Construction has pulled repeat permits and the site itself has a deep permit history (25+ permits, all contractors). Each links to that parcel’s full record.
- Wise Construction192 commercial alteration
- Siena Construction Corporation166 commercial alteration
- The Richmond Group84 commercial alteration
- Pidc Construction69 commercial alteration
- Gloucester Builders68 commercial alteration
- Berkeley Building Company67 commercial alteration
Put Bond Building Construction on your call list.
Watch this contractor, get a daily email when they pull a new permit, and explore Boston permits in the Market Explorer — enriched and parcel-joined.