Permit Record

Alteration Residential

1006 N Calvert St, Baltimore, MD

Classification1-08Residential Alteration
Reliable value$33,525
ContractorNot in source
Permit record
Parties
Contractor
Not in source
Applicant
Not in source
Owner
Not in source
Architect
Not in source
Engineer
Not in source
Contractor license
Not in source
Building & lot · PLUTO
Building class
Not in source
Zoning district
Not in source
Lot area
Not in source
Year built
Not in source
Units (total)
Not in source
Units (residential)
Not in source
Units (commercial)
Not in source
Floor area
Not in source
Parcel & enrichment
Parcel APN
0507 004
Climate zone (IECC)
4A
Roof area (est.)
Not derivable — no building-size signal for this permit
HVAC tonnage (est.)
Not derivable — no building-size signal for this permit
Building type
Not in source
Building subtype
1-08
Geocode & dates
Coordinates
39.3014, -76.6134
Geocode confidence
100%
Geocode source
geocodio
Issued
Aug 10, 2023
Applied
Not in source
Work class
Residential
Description
Source description

GUTTER REPL AND CHIMNEY/ROOF REPAIR -SCOPE OF WORK TO FOLLOW CHAP ATP EXACTLY. ALL WORK PER CODE.************* AS PER THE CHAP ATP: GUTTER REMOVE AND REPLACE THE FRONT LEFT AND FRONT RIGHT SIDE, BUILT-IN GUTTER SYSTEMS ON THE FRONT OF THE HOUSE. NEW COPPER GUTTERS WILL BE FABRICATED FROM 20 OZ COPPER TO MATCH OR IMPROVE THE EXISTING DESIGN AND SOLDERED AT THE SEAMS. AN OUTLET DOWNSPOUT ELBOW WILL BE SOLDERED TO THE NEW GUTTER TO LEAD WATER TO A NEW COPPER COLLECTOR HEAD AND MOUNTED IN THE SAME PLACE AS THE OLD COLLECTOR HEAD IN ORDER TO REUSE THE MAIN DOWNSPOUTS COPING CAPS INSTALL APPROXIMATELY 30 FEET OF COPING CAP OVER THE BROWNSTONE CAPS ON THE REVERSE GABLE OF THE FRONT SLATE ROOF AND THE PARTY WALL BETWEEN THE HOUSES. CAPS ARE TO BE FABRICATED FROM 20 OZ COPPER. COPPER CAPS WILL BE CLEATED AND POP RIVETED IN PLACE. STEP AND COUNTER FLASHING REPLACEMENT: REMOVE AND REPLACE STEP AND COUNTER FLASHING AT THE LEFT AND RIGHT SIDES OF THE MAIN WINDOW DORMER. SLATE WILL BE REMOVED AROUND THE FLASHING TO PROPERLY REMOVE DEGRADED FLASHING. WOOD DECKING WILL BE REPAIRED AS NECESSARY. HIGH-GRADE UNDERLAYMENT WILL BE INSTALLED USING CAP NAILS. KICK-OUT AND TRANSITION FLASHING WILL BE SOLDERED AT CRITICAL, LEAK-PRONE AREAS, FOR A WATER-TIGHT SEAL. NEW FLASHING WILL BE MADE FROM 16 OZ COPPER. THE ORIGINAL SLATE WILL BE REINSTALLED AFTER NEW FLASHING HAS BEEN INSTALLED. THE DAMAGED SLATE WILL BE REPLACED WITH THE SAME RECLAIMED PEACH BOTTOM SLATE. SLATE REPAIR: REMOVE AND REPLACE (15) DAMAGED OR BROKEN-FIELD SLATE ON THE FRONT SLATE ROOF REPLACEMENT SLATE WILL BE THE SAME SIZE (16”X9”) AND OF THE SAME QUARRIED (PEACH BOTTOM) SLATE. ALUMINUM BIBS WILL BE BLACK. ADD ON: (34) NON-PEACH BOTTOM SLATE CAN BE REPLACED IN ORDER TO RESTORE THE SLATE ROOF TO ITS ORIGINAL CONDITION. CHIMNEY FLASHING & TUCK POINT: REMOVE AND REPLACE CHIMNEY FLASHING NEW FLASHING WILL BE FABRICATED ON-SITEFROM 16 OZ COPPER USING MASTER ROOFING TECHNIQUES FOR LONG LASTING PROTECTION AROUND THE CHIMNEY. CORNERS ARE TO BE SOLDERED USING 50/50 LEAD/TIN SOLDER AND COUNTER FLASHINGS TO BE INSTALLED USING THE TUCK FLASHING METHOD. REGLET IS TO BE SEALED USING LIMESTONE-COLORED POLYURETHANE SEALANT. LEFT CHIMNEY IS TO HAVE TUCKPOINTING WITH NEW HIGH-STRENGTH CONCRETE MORTAR AS NECESSARY TO REPAIR DEGRADED MORTAR JOINTS. THE OLD JOINT WILL BE GROUND OUT AND CLEANED TO REMOVE DUST AND DEBRIS BEFORE NEW JOINTS ARE APPLIED. ALL WORK TO MATCH PLANS/INFORMATION/SPECS IN CHAP FILES EXCEPT WHERE THIS ATP SUPERSEDES IT.

Status
Current status
issued
Source status
Issued
Expired
Feb 10, 2024
Provenance
First seen by PermitCore
May 20, 2026 · 02:40 UTC
Last seen
Jun 25, 2026 · 01:03 UTC
Last changed
Jun 25, 2026 · 01:03 UTC
Data-quality checks0 of 12 flagged

0 of 12 data-quality rules flagged anything on this permit.

Checks not flagged

  • Geocode out of bounds
  • Geocode is sentinel
  • Issued date in the future
  • Issued date parse bug
  • Issued date is placeholder
  • Commercial units is placeholder
  • Residential units out of bounds
  • Residential units is placeholder
  • Total units out of bounds
  • Total units is placeholder
  • Valuation out of bounds
  • Valuation is placeholder
Project timeline at this parcel

4 permits at this parcel (parcel 0507 004) · Jun 16, 2022Aug 10, 2023

  1. Aug 10, 2023This permitAlteration Residential · Issued$33,525
  2. Aug 3, 2023baltimore_COM2023-75194MEP Electrical · Issued$2,500
  3. Apr 17, 2023baltimore_COM2023-58912Other · Issued$15,000
  4. Jun 16, 2022baltimore_COM2022-70685Other · Issued$8,760

Full permit history at this parcel · as of Jul 8, 2026.

Developer details
Permit #
baltimore_COM2023-75669
Canonical ID
337:baltimore_COM2023-75669
Source permit ID
baltimore_COM2023-75669
Browse Baltimore permits in the Market Explorer →Pull this permit via /v1/permits →