Alteration Residential
13 S Carey St, Baltimore, MD
- Contractor
- Not in source
- Applicant
- Not in source
- Owner
- Not in source
- Architect
- Not in source
- Engineer
- Not in source
- Contractor license
- Not in source
- Building class
- Not in source
- Zoning district
- Not in source
- Lot area
- Not in source
- Year built
- Not in source
- Units (total)
- Not in source
- Units (residential)
- Not in source
- Units (commercial)
- Not in source
- Floor area
- Not in source
- Parcel APN
- 0216 043
- Climate zone (IECC)
- 4A
- Roof area (est.)
- Not derivable — no building-size signal for this permit
- HVAC tonnage (est.)
- Not derivable — no building-size signal for this permit
- Building type
- R
- Building subtype
- Dwelling: Rowhouse
- Coordinates
- 39.2880, -76.6379
- Geocode confidence
- 100%
- Geocode source
- geocodio
- Issued
- Mar 14, 2026
- Applied
- Not in source
- Work class
- Residential
Source description
SCOPE OF WORK: -------- INTERIOR/EXTERIOR ALTERATIONS -------- - REPLACE 3 EXTERIOR DOOR, REPLACE 7 WINDOWS (same size and locations), REPLACE FLOORING/ KITCHEN CABINETS. - RELOCATE STAIRS AND COMPLETE INTERIOR FRAMING. - REPLACE DAMAGE JOISTS AND DAMAGE EXTERIOR 2X4 WOOD STUDS. - PAINT INTERIOR AS NEEDED, REPLACE PANELING AND INSTALL DRYWALL AS NEEDED. --------- EXTERIOR ALTERATIONS --------- - REPLACE ROOFING. REPLACE ROOFING DAMAGE TRUSES AS NEEDED. ADD REAR ADDITION AS PER CODE AND AS PER PLANS, REPAIR REAR AND FRONT RAILING REPAIR REAR SIDING - AS PER THE DEPARTMENT OF PLANNING: REPLACEMENT WINDOWS SHALL COMPLY WITH REGULATIONS ON PAGE 21 OF THE BROADWAY EAST URBAN RENEWAL PLAN AND THE SIZE OF THE WINDOW AND DOOR OPENINGS SHALL NOT BE ALTERED OR REDUCED IN SIZE IN ANY WAY "ALL WINDOWS MUST BE TIGHT FITTING AND HAVE SASHES. AS PER PLANS AND AS PER CODE. ********* 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7'. 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36". 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQFT FOR ONE OCCUPANT OR 50SQFT PER OCCUPANT. 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES) ********** ********* SEPARATE PERMITS WILL BE PULLED FOR MEP WORK. Approved For Work only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance Comments Approved as per CHAP Authorization to Proceed. Complete the following scope of work at the front façade: At the 1st floor, replace the door with a 4-panel wood door with Baltimore bullnose trim. Replace windows at 1st, 2nd, and 3rd floors with 4/4 wood or aluminum clad wood windows with Baltimore bullnose trim. Doors and windows to fit the existing masonry openings without additional framing or filler. At the roofline, install metal half-round gutter and replace downspout with a full-round metal downspout to match existing. Install one black exterior lantern sconce adjacent to the main entryway. Door to be painted with Sherwin Williams SW6258 – Tricorn Black. Gutters, downspouts, windows, and windows trim with Sherwin Williams SW7005 – Pure White. Complete the following scope of work at the side elevation: At the 2nd floor, replace the window with one white 1/1 double hung window. Vinyl window should not be wrapped in metal after installation. Window to fit the existing masonry openings with no additional framing or filler. Complete the following scope of work at the rear elevation: At the 1st floor, replace the door with one 6-panel fiberglass door. At the 2nd floor, replace the window with one white 1/1 double hung window. Door and windows to fit the existing masonry openings with no additional framing or filler. At the 3rd floor, construct one (10’ x 11’), vertical addition with two white 1/1 double hung windows facing the alley and clad with cementitious smooth-lap horizontal siding. Vinyl windows should not be wrapped in metal after installation. Install one black exterior lantern sconce adjacent to the main entryway. At grade, level, re-grade, and repair concrete pad with concrete to match existing. Cementitious smooth-lap horizontal siding to be painted with Sherwin Williams SW0055 – Light French Gray. Complete the following work at the roof: Install new roof torch-down modified bitumen roofing membrane at the main block and new addition to match existing. All work to be completed as per information/plans/specs in CHAP files except where this ATP supersedes.
- Current status
- issued
- Source status
- Issued
- Expired
- Sep 10, 2026
- First seen by PermitCore
- May 20, 2026 · 02:35 UTC
- Last seen
- Jun 25, 2026 · 00:50 UTC
- Last changed
- May 20, 2026 · 02:35 UTC
0 of 12 data-quality rules flagged anything on this permit.
Checks not flagged
- Geocode out of bounds
- Geocode is sentinel
- Issued date in the future
- Issued date parse bug
- Issued date is placeholder
- Commercial units is placeholder
- Residential units out of bounds
- Residential units is placeholder
- Total units out of bounds
- Total units is placeholder
- Valuation out of bounds
- Valuation is placeholder
- Mar 14, 2026This permitAlteration Residential · Issued$50,000
- Dec 1, 2025baltimore_BRCM-25-022671Demolition · Issued$5,000
Full permit history at this parcel · as of Jul 8, 2026.
Developer details
- Permit #
- baltimore_BRCM-25-024558
- Canonical ID
- 337:baltimore_BRCM-25-024558
- Source permit ID